by Brian Kashas | Aug 13, 2013 | Lacko
Burnt wood floor before the repair Floor installed, ready for sanding Rough plumbing and electrical are in Oops! Swanstone shower pan, set loosely until the wall panels are installed Gonzalo getting the door jambs prepped...
by Brian Kashas | Aug 2, 2013 | Lacko
Aaron and I took the vanities and toilets to Re-store. Â Unfortunately, they can’t take the toilets because they aren’t low-flow 1.6 gallons per flush. Â They might make a nice yard decoration- perhaps one could plant some flowers in them :). You get a...
by Brian Kashas | Aug 2, 2013 | Lacko
Day 2 was considerably more strenuous than Day 1. Â The glue down wood floor came out in little tiny pieces and the vinyl backing upstairs had to be scraped off little by little. Â The good news is that the hall bath floor came up easily. Â John the cabinet guy came...
by Brian Kashas | Aug 2, 2013 | Lacko
Day one went well. Â The wallpaper came down quite easily. Â The vinyl in the upstairs bath was glued directly to the plywood sub-floor which meant acquiring a better scraper for removal than I had with me…we’ll save that for the next day....